Supplier Document Requirements List

A Supplier Document Requirements List (SDRL) is the customer's list of which documents a supplier must deliver, in what format and by when, as part of the contract or purchase order.

Also known as: SDRL, VDRL, Vendor Document Requirements List, document requirements list

The SDRL comes with the purchase order and makes the documentation requirements concrete. Each line is a document or document type, with a code, a description, a due date tied to a milestone and whether the document goes for approval or for information only. Some customers call it a VDRL (Vendor Document Requirements List). The supplier uses the SDRL as a checklist throughout the project: drawings and procedures are submitted for comment early, revised and approved, while certificates and test reports arrive along the way and end up in the MRB at delivery. The status of each document, from revision to submitted, commented and approved, has to be tracked as the project runs. A missing document at delivery can hold up both acceptance and payment.

In Norwegian context

NORSOK Z-018 describes supplier documentation for equipment and is a common reference for the document codes in SDRLs in Norwegian oil and gas. Individual customers may still have their own codes and requirements, so the SDRL in the contract is what applies.

Related terms

  • Manufacturing Record Book — A Manufacturing Record Book (MRB) is the complete manufacturing documentation for a delivery: certificates, welding and NDT records, test and dimensional reports that show the equipment was made to requirements.
  • Material certificate 3.1 — A 3.1 material certificate is an inspection certificate under EN 10204 in which the manufacturer confirms that the material meets the requirements of the order, with results from specific inspection, validated by an inspection representative independent of manufacturing.
  • As-built documentation — As-built documentation shows the equipment or installation as it was actually built and installed, with every change from the original drawings included.
Fixed price per phase · Full source code, owned by you · Reply within one business day

We build what you need. Let's figure out what that is.

Book a 30-minute meeting, or send us a few lines about what's grinding. We reply within one business day.

You can change these choices at any time. Necessary is always on because it is required for the site to work.

Necessary

Required for basic functionality, such as remembering your consent choice. No tracking.

Statistics

Anonymised visit statistics via Google Analytics 4. Helps us understand which pages people read.

Product insights

Detailed behavioural analysis via PostHog, including session recording with masked input fields. Used to improve the user experience.